Quick Facts
Grand Opening: April 14, 2007
Project
name: Redbud Theater Complex,
Texas Woman’s University
Architect: Bottino Grund Architects, New
York, NY and Austin, TX
Construction: Joe Funk Construction Engineers, Inc. Dallas, TX
Expected
start of construction: Spring 2006
Expected
date of completion: March 2007
Cost:
Total project cost: $3.2 million
General
Project Information:
Main
Aspects of project:
-
New home
for TWU renowned drama program
-
Theater
space for drama education, public
performances, public presentations and
speakers.
-
Drama
education spaces:
- Rehearsal Room
- Practice Rooms
- Make-up Classroom
- Conference Rooms
- Faculty Offices
-
Theater
support spaces:
- Scene Shop
- Costume Shop
- Prop and Costume Storage
-
New
accessible entry at east end maintaining
historic character of Hubbard Hall
exterior.
-
Full
length undulating wall that organizes all
the public lobbies while maintaining the
historic character of the perimeter wall.
The undulating wall recalls the curved wall
in front of Redbud Theater.
-
Expanded
central lobby with natural light.
-
Expanded
lobby services with box office,
concessions and new public toilets.
-
Proscenium theater with raked seating
creating an intimate arrangement between
performers and audience.
-
Design
incorporates construction components of the retired Redbud
Theater and Hubbard Hall (ribbed glass panels) in imaginative
ways.
|